Some of Firstar’s Joint Venture, Al-Nafees Implemented projects

Complementation of Lateefiya Irrigation Project 2009

Construction of Burn Treatment Center in Fayhaa General Hospita 2014

Some of Firstar’s Joint Venture, Al-Bilal Group’s Implemented projects

Awarded Me&I works for Qurainat temporary compressor April 20th, 2015

Awarded pump rehabilitation at Umm Qasr Terminal

Awarded removal of Berns at CS 2-5 and N. Rumaila CS april 18th, 2015

Awarded 2x civil packages at Karbala refinery  April 16th, 2015

34. Infrastructure work for main camping site of WII at CAMP VICTORY
CLEINT: WASHINGTON INTERNATIONAL INC

35. Supplying and Installing 2 X 250KV Generators at GREEN ZONE
CLEINT: WASHINGTON INTERNATIONAL INC

36. Supply, install and test (2) new 11 KV underground feeder cable in ABU DISHER (33 / 11) KV substation
CLIENT: PROJECT & CONTRACTING OFFICE (PCO) USA GOV.

37. Preparing full assessment and study for SCADA systems in (57) substations in all BAGHDAD area including determination of scope of work, estimations of quantities, estimations of costs, site visits, taking photos, Auto CAD drawings for civil, single line diagrams, issuing walk down sheets, determination of full sites statuses and collecting all necessary detailed data.
CLEINT: WASHINGTON INTERNATIONAL INC

38. Preparing full assessment for WASSIT substations (33 / 11) KV in all (10) sites including collecting data, locating GPS coordinates, site visits, taking photos, collecting name data plates, estimations of quantities, estimation of costs and participating in the determination of scope of work for civil and electrical
CLIENT: WASHINGTON INTERNATIONAL INC

39. Preparing full assessment for DIYALA substations (33 / 11) KV in all (14) sites including collecting data, locating GPS coordinates, site visits, taking photos, collecting name data plates, estimations of quantities, estimation of costs and participating in the determination of scope of work for civil and electrical
CLIENT: WASHINGTON INTERNATIONAL INC

40. Preparing full assessment for BAGHDAD area substations (132) KV in all (3) sites including collecting data, locating GPS coordinates, site visits, taking photos, collecting name data plates, estimations of quantities, estimation of costs and participating in the determination of scope of work for civil and electrical . The substations are (AGARGOUF, TAJI and WASHASH)
CLIENT: WASHINGTON INTERNATIONAL INC

41. Preparing full assessment for BAGHDAD area substations (400) KV in (2) sites including collecting data, locating GPS coordinates, site visits, taking photos, collecting name data plates, estimations of quantities, estimation of costs and participating in the determination of scope of work for civil and electrical The substations are (West Baghdad and East Baghdad)

42. Full electrical assessment for 12 Scada substation projects (400kv &132kv) at BAGHDAD
CLIENT: WASHINGTON INTERNATIONAL INC.

43. Full electrical assessment for 19 Scada substation projects (400kv &132kv) at NINAWA
CLIENT: WASHINGTON INTERNATIONAL INC.

44. Full assessment for rehabilitation (400kv) substation project at BAGHDAD EAST.
CLIENT: WASHINGTON INTERNATIONAL

45. Full assessment for rehabilitation (400kv) substation project at BAGHDAD WEST
CLIENT: WASHINGTON INTERNATIONAL INC.

46. Full assessment for rehabilitation (400kv) substation project at BAGHDAD SOUTH.
CLIENT: WASHINGTON INTERNATIONAL INC.100

47. Full assessment for rehabilitation (400kv) substation project at BAGHDAD NORTH.
CLIENT: WASHINGTON INTERNATIONAL INC

48. Drilling and soil investigation for three substations in NINAWA – Iraq.
CLEINT: WASHINGTON INTERNATIONAL INC.

49. Surveying and soil investigation for KUT-BUTAIRA reclamation Project WASSIT –Iraq.
CLEINT: WASHINGTON INTERNATIONAL INC.

50. Rehabilitation of civil works for building and foundations and cable trenches EAST BAGHDAD (400 KV) substation
CLEINT: WASHINGTON INTERNATIONAL INC.

51. Rehabilitation of civil works for building and foundations and cable trenches of AGARGUF (132 KV) Substation
CLEINT: WASHINGTON INTERNATIONAL INC.

52. Erection and installation with commissioning of ALTAJIJ (132 KV) main transformer)
CLEINT: WASHINGTON INTERNATIONAL INC

Some of Firstar’s Joint Venture, Al-Bilal Group’s Ongoing projects

1 Infrastructure work for main camping site of WII at CAMP VICTORY
CLEINT: WASHINGTON INTERNATIONAL INC

2. Construction and installation of two 33/11 KV substations in Baghdad area (ABU DITSHEER AND ALMEKANEEK) sites
CLEINT: BECHTEL

3. Rehabilitation of ALHASSAN EBIN ALHAITHEM energized substation in Baghdad area
CLEINT: BECHTEL

4. Construction and installation of four 33/11kv substations in Wassit – Iraq. (ALMOUWAFAKIA, SHIEK SAAD, ALEZAH, ALKARAMA) Sites
CLEINT: WASHINGTON INTERNATIONAL INC

5. Construction and installation of two 33/11kv substations in Diyala-Iraq. (ALSALEM, ALNAY) Sites
CLEINT: WASHINGTON INTERNATIONAL INC

6. Construction and installation of AL-AHRAR 33kv overhead transmission line in Wassit – Iraq.
CLEINT: WASHINGTON INTERNATIONAL INC

7. Construction and supply of ALEZAH (33 / 11 KV) underground line
CLEINT: PCO (PROGRAM CONTRACTING OFFICE / US GOVERNMENT)

8. Supply installation, and commissioning 2 (1000 KVA) diesel generators to CAMP VICTORY.
CLEINT: WASHINGTON INTERNATIONAL INC

9. Providing assessment for the EAST EUPHRATES for survey works and calculations
CLEINT: WASHINGTON INTERNATIONAL INC

© Copyright 2018- Firstar | All Rights Reserved.